Sunday 24 January 2010

glazing, aft access cover and foredeck.


ground down scuttles inside flush with hull
glazed with small squares of clear plastic
glued on with polystyrene cement. while these
were going off----



built frames for deck sheathing on aft inspection
cover. i cut the wood sheathing at the same time
and used each piece as a jig for the next cross frame
ensuring a good fit. numbered each wood piece
and its corresponding position on cover.
fitted the aft catch for cover.
then built up accomodation coaming. when
finished accomodation lifts off allowing access to batteries,
receiver, speed controllers and thruster.
finally glued foredeck to hull.
total hours 39.

No comments:

Post a Comment